Window installation quote scope: flashing, air sealing and trim
Check what “installation included” covers. Ask for separate details on retained frames, flashing, drainage, air sealing and trim.
Reviewed
What should the installation line say?
For each opening, ask which frame parts stay, how the installer will manage water and air at the opening, and who restores interior and exterior finishes. For a full-frame quote, ask how new flashing connects to the wall’s water-resistive barrier. For an insert, ask how the retained frame and sill will be checked.
What to itemize for insert and full-frame work
| Work item | Insert quote | Full-frame quote |
|---|---|---|
| Frame and sill | List retained parts and how the installer will check them for damage, fit and drainage. | Identify what comes out to expose the rough opening, and how damage found after removal is priced and approved. |
| Flashing and drainage | State which existing drainage details stay accessible and what repairs, if any, the quote covers. | Describe sill, jamb and head flashing and how it ties into the wall’s water-resistive barrier. |
| Air sealing | Identify where the new unit is sealed to the retained frame. Ask whether the old frame-to-wall gap can be reached or is excluded. | Identify where the new frame-to-rough-opening gap will be insulated and air sealed. |
| Trim and finish | List any stops, casing or exterior trim to be replaced and whether painting is included. | List any casing, siding or stucco disturbed by removal, who restores it, and what finishing costs extra. |
Ask how the details fit the manufacturer’s instructions and the condition of your wall. PNNL checklist for insert and full-frame work. See PNNL’s full-frame flashing and air sealing details for the rough opening.
Example: “exterior trim included”
An insert bid may use that phrase to mean covering existing trim, while a full-frame bid may mean removing and replacing trim to reach the opening. Ask each installer which pieces stay, whether flashing is included and who handles painting. If one quote leaves a repair unpriced, mark it as an open item before comparing the totals.
Wording to copy into a quote request
“For each opening, please list the parts you will keep or remove, the planned flashing and air sealing, and who restores and paints the trim. If you find damage after removal, tell me how you will price it and obtain my approval before proceeding.”