Bay window replacement: what to include in the quote

Compare the unit, structural support, roof tie-in and finish work when replacing a bay window or converting a flat opening.

Reviewed

What makes a bay window quote different?

Ask for a price for the entire projecting assembly, including how it will be supported, weatherproofed and finished. Replacing an existing bay and converting a flat opening are different scopes. For a conversion, ask whether the opening, framing or roof connection will change and who checks permits.

Compare what stays and what changes

Quote itemReplacing an existing bayConverting a flat opening
Assembly and supportIdentify whether the whole assembly is replaced or only individual units. Ask whether existing support can be reused.Ask how the new projection will be supported and whether framing or the opening must change.
Roof and drainageIdentify any existing roof, flashing and siding to be retained or replaced. Ask who fixes damage found after removal.Ask whether a roof or soffit tie-in is included and how it will drain and connect to the wall.
Interior and exterior finishSpecify what happens to the seat board, casing, siding, insulation and paint.Get separate lines for the seat and head boards, insulation, interior finish and exterior restoration.

Support details depend on the product and the building. Andersen’s model-specific instructions (PDF) illustrate why the installer should identify the support method for the quoted assembly. Pella’s bay replacement guide describes how changes in support and structure can affect the job.

How to enter a bay window in your budget

Hypothetical quote for one bay assembly. A $3,200 installed assembly plus $400 in separate finish work gives a known subtotal of $3,600. In the calculator, enter a count of 1 at $3,200 with the Installed price basis. Under Trim and finish repairs, select Add a cost and enter $400. Here 1 represents the entire quoted assembly, including any panes or units covered by that price. Leave unpriced framing repairs as unknown under Other project fees.

Sources